    环氧地坪施工的技术和工艺要求有哪些

    2018-11-07 10:27:36 无锡盛发地坪科技有限公司 阅读

    厚浆型工业环氧地坪涂料的施工,环氧地坪施工职员应保证充分的设备、人力以及质料,以保证针对悉数独立地板区域的拌和以及后续施工过程,都可以一次性接连结束。拌和结束后马上将质料浇注到已处理好的基层上,平均、迟缓地实施摊敷,抵达要求的厚度,重视不要操作过分。拌和好的质料一定在规章的运用时限内运用,相关运用时限,请参见产物注脚书。

    In the construction of thick slurry industrial epoxy floor coating, the epoxy floor construction staff should ensure adequate equipment, manpower and material to ensure that the mixing of all the independent panel areas and the subsequent construction process can be completed one-time and one-time. Immediately after mixing, the material will be poured onto the treated grass-roots, spread evenly and slowly, reach the required thickness, and pay attention not to operate excessively. Mixed materials must be used within the application time limit of the regulations. For the relevant application time limit, please refer to the product footnote book.

    涂敷后,应马上运用尼龙钉齿辊对涂层质料实施辊压,根除纤细的批刮踪迹,并帮忙释放空气。辊压操作时,应按同样轨道往复实施。涂层厚度抵达1mm。

    After coating, nylon nail roller should be used to roll the coating material immediately to eradicate the fine scraping trace and help to release air. When rolling operation, the same track should be reciprocally implemented. The thickness of the coating reaches 1mm.

    涂料的配比、拌和、熟化、涂装空隙等严厉产物注脚书上的注脚操作。施工者应做好施工部位、韶光、温度相对湿度,环氧地坪表面处理程序、质料实耗的记载,以备覆按。

    The footwork in the footnote book, such as the proportion of the paint, mixing, aging, and coating gaps. Construction site, Shaoguang, temperature and relative humidity, floor surface treatment procedures and material consumption should be well recorded by the builder in order to be covered.

    施工现场的环境温度应高于5℃,相对湿度应小于85%。涂料粘度过高时,可参加昊盛专用稀释剂,但不宜超出10%。涂层厚度的测定,可以湿膜测厚仪测定,或在现场安放样板,一起施工给与检测。

    The ambient temperature of the construction site should be higher than 5 degrees, and the relative humidity should be less than 85%. When the paint viscosity is too high, it can participate in the special diluent of Ho Sheng, but it should not exceed 10%. The thickness of coatings can be measured by wet film thickness gauge or by placing sample boards on the spot and testing them together.

    一个完整的环氧地坪漆的施工流程大致可以分为以下几个要素;

    The construction process of a complete epoxy floor paint can be roughly divided into the following elements.

    素地处理,底涂层,中涂层,批涂层和面涂层,具体操作步骤如下;

    Ground treatment, bottom coating, middle coating, batch coating and surface coating are as follows:

    素地处理

    Vegetarian treatment

    1基础素地以水泥粉光面或磨石地为准;

    1 the foundation shall be based on cement powder or grindstone.

    2素地需养生28天以上,水份需8%以下方可施工素地如有不平或空鼓需加以除去;

    2. The vegetable land needs to be kept in good health for more than 28 days, and the water content needs less than 8% before it can be removed if there is unevenness or empty drum in the construction of the vegetable land.

    3用环氧砂浆补平地面;

    3 use epoxy mortar to mend the ground.

    4素地之油污需澈底清洗干净;

    4, oily dirt must be cleaned thoroughly.

    底涂层

    Bottom coating

    1施工前需保持干净如有杂物粘附需清除依照正确比例将主剂及硬化剂混合,充分搅拌;

    1. Keep clean before construction. If there is debris adhesion, remove and mix the main agent and hardening agent according to the correct proportion and mix them fully.

    2需视地面情况调整适当粘度混合完成材料需4小时以内施工完成;

    2 it is necessary to adjust the proper viscosity and finish the material within 4 hours according to the ground conditions.

    中涂层

    Medium coating

    1施工前需要保持干净如有杂物粘附需清除依照正确比例将主剂及硬化剂混合,充分搅拌;

    1. Keep clean before construction. If debris adheres, remove and mix the main agent and hardening agent according to the correct proportion and mix them fully.

    2将混合完成的树脂适量加入石英砂;

    2 add proper amount of resin to the quartz sand.

    3使用镘刀将材料均匀涂布;

    3 use the trowel to evenly coat the material.

    4混合完成材料需30分钟以内施工完成;

    4 the mixture will be completed in less than 30 minutes.

    5施工交接处做好交接处理;

    5 transfer handover at construction juncture.

    6中涂层养生硬化时间约8小时以上。

    6 medium coating curing time is more than 8 hours.

    批涂层

    Batch coating

    1依照正确比例将主剂及硬化剂混合,充分搅拌;

    1 mix the main agent and hardener according to the right ratio and stir well.

    1使用批刀将材料涂布均匀;

    1 use batch knife to coat the material evenly.

    2混合完成材料需30分钟内施工完成;

    2 the mixture will be completed in 30 minutes.

    4批土养生硬化时间约8小时以上;

    The 4 batch of soil curing time is more than 8 hours.

    面涂层

    Surface coating

    1施工前需保持干净如有杂物粘附需清除;

    1 before construction, it is necessary to keep clean.

    2使用前主剂先搅拌均匀;

    2 use the main agent before mixing.

    3依照正确比例将主剂及硬化剂混合,充分搅拌;

    3 mix the main agent and hardener according to the right ratio and stir well.

    4使用滚筒或镘刀将材料均匀涂布混合完成材料需30分钟以内施工完成;

    4 use a roller or trowel to evenly coat the material and complete the material in less than 30 minutes.

    5施工交接处需做好交接处理;

    5 construction handover should be handled well. 