    如何区分耐磨地坪和混凝土密封固化剂地坪施工?

    2018-11-04 06:26:27 无锡盛发地坪科技有限公司 阅读

    耐磨地坪施工时耐磨骨料完全被深入混凝土表层,施工是和混凝土同步施工的。施工完工后与混凝土融为一体,最后的成品就是混凝土的样子。但在此时混凝土就不会出现原来容易出现的问题,比如:用一段时间后出现风化、粉化、氧化、表面粗糙,容易起尘,不耐酸碱,不耐油污等。

    During the construction of wear-resistant floor, the wear-resistant aggregate is completely penetrated into the surface of concrete, and the construction is synchronized with that of concrete. After completion of construction, concrete is integrated with the concrete, and the final product is the appearance of concrete. But at this time, concrete will not appear the original easy problems, such as: after a period of time, there will be weathering, powdering, oxidation, rough surface, easy to dust, acid and alkali resistance, oil resistance and so on. 

    混凝土密封固化剂环氧地坪施工时必须先等混凝土完全凝固后施工,施工前必须确保混凝土完全干燥,一般是混凝土施工后养护20天左右后再施工固化剂。固化剂完全渗透进混凝土与混凝土融为一体,最后的成品也是混凝土原来的样子。但是此时的混凝土已经形成密实的整体,抗渗透、抗压、耐磨、耐酸碱盐的腐蚀,不起灰,无需维护和保养。

    The construction of concrete sealant curing agent floor must first wait for concrete to be fully solidified before construction. Before construction, it must ensure that concrete is completely dry. Generally, the curing agent is constructed after 20 days of concrete construction and maintenance. The curing agent penetrates into the concrete completely and merges into the concrete. The final product is the original form of the concrete. But at this time concrete has formed a compact whole, anti-permeability, compression, wear resistance, acid and alkali corrosion resistance, no ash, no maintenance and maintenance.

    其实不论是耐磨地坪还是混凝土密封固化环氧地坪,都是为了使混凝土更抗碱、抗酸、抗油污。前者需要在地面成型前着手准备,后者需在成型地面或老地坪上施工。其施工时间大有不同,可将两种工艺相互结合使用,全方面提高地坪的抗压性、使用寿命等优化功能。

    In fact, whether it is wear-resistant floor or concrete sealed and solidified floor, it is to make concrete more alkali-resistant, acid-resistant and oil-resistant. The former needs to prepare before the ground is formed, and the latter needs to be constructed on the molding ground or the old floor. The construction time is quite different. The two technologies can be used together to improve the compression resistance and service life of the floor in all aspects.