    如何有效缩短环氧地坪工程的工期?

    2018-11-01 08:18:15 无锡盛发地坪科技有限公司 阅读

    很多工程尤其是大型工程都有工期安排和工期预计,必须在规定工期内完成重庆环氧地坪项目,如何保证环氧地坪工期呢?如下总结:① 组织一个以项目经理为首的权威现场施工领导班子,实行统一领导、统一管理、统一协调。② 制订施工管理人员工作责任制,做到职责明确,奖罚分明。③ 抓好开工前施工准备工作,开工前先遣部分管理人员进场,做好与建设单位、总承包单位关于场地交接工作,及时落实好实际进场时间,熟悉施工现场环境。

    Many projects, especially large-scale projects, have schedules and schedules. It is necessary to complete the epoxy floor project in Chongqing within the specified time limit. How to guarantee the construction period of epoxy floor? The following conclusions are drawn: 1. To organize an authoritative on-site construction leading group headed by the project manager, to implement unified leadership, unified management and unified coordination. Second, work out the responsibility system of the construction management personnel, so as to achieve clear responsibilities and rewards and penalties. (3) Pay attention to the preparatory work of construction before the start of construction, advance some managers to the site before the start of construction, do a good job with the construction unit, general contractor on site handover work, timely implementation of the actual arrival time, familiar with the construction site environment. ④ 编好劳动力、施工机械、周转材料计划、合理组织计划。

    Fourth, compile labor force, construction machinery, turnover material plan and organize the plan reasonably.

    ⑤ 确保所有机械设备,周转材料,主要材料的按时供应,杜绝因材料供应不及时而造成的不必要的怠工。

    _To ensure the timely supply of all machinery and equipment, turnover materials and main materials, and to prevent unnecessary idling caused by the lack of timely supply of materials.

    ⑥ 强化通讯联络、交通运输、施工整体调度等各种手段,高效、科学指挥施工。

    _Strengthen communication and liaison, transportation, construction of the overall scheduling and other means, efficient and scientific command of construction.

    ⑦ 做好工序前的准备工作,在工序前由施工员负责落实各方面的准备工作,如工作面,施工机械,主要材料,技术复核和隐蔽工程检验等,并检查落实。

    _Preparatory work before the working procedure should be done well. Before the working procedure, the builder should be responsible for all aspects of preparatory work, such as working face, construction machinery, main materials, technical review and hidden engineering inspection, and check the implementation.

    ⑧ 实行边施工边检查,进行全过程控制。采用分段分部位验收,减少中间环节,有利于实行施工作业的开展,以缩短工期.

    Carry out inspection along the construction side and carry out the whole process control. Adopting sectional and partial acceptance to reduce intermediate links is conducive to the implementation of construction operations and shorten the construction period.

    只有严格执行施工组织设计,才能确保按时竣工。拥有强大的管理团队和施工团队,能够在最短的时间内创造最大的价值!

    Only by strictly implementing the construction organization design can we ensure the completion on time. With a strong management team and construction team, we can create the greatest value in the shortest time.