    固化剂地坪如何施工才能达到最佳固化效果

    2018-10-31 07:14:33 无锡盛发地坪科技有限公司 阅读

    首先是对基面的处理,根据地面情况进行打磨处理,除去表面上存在的大沙砾、旧涂层、水泥渣等,待地面清洗干净后,再喷洒混凝土密封固化剂碱性材料浸泡在混凝土表面让其表面浸湿、饱和,当然也有直接将混凝土密封固化剂施工在混凝土的表面,然后用扫帚扫开铺平。在这个步骤的处理中,需要注意的是,混凝土密封固化剂是渗透的液体,不是一层涂膜,因此只有当它在混凝土表面上的分布量足够多时,才可以充分往内里渗入。

    First of all, the treatment of the foundation surface, according to the ground situation grinding treatment, remove the surface of the existing large gravel, old coatings, cement slag, etc., after the ground cleaning, then spraying concrete sealant alkaline material immersed in the surface of concrete to wet, saturated, of course, there are also direct concrete sealing and solidification The chemicals are applied to the surface of the concrete and then swept away by broom. In this step of treatment, it should be noted that the concrete sealant is a permeable liquid, not a coating, so only when it is distributed on the concrete surface enough, it can be fully infiltrated into the inside. 固化剂环氧地坪施工的环境也是至关重要的,如果是在25℃左右,使用密封固化剂浸湿混凝土表面的时间需要持续30分钟左右,判断的依据是等待浸泡在表面上的材料变粘,并达到用脚踩踏时有类似凝胶质的粘滑感。如果是在严寒的冬季,虽然室内温度达到25℃左右,但这个变粘滑过程可能就需一小时或更长的时间才能完成,相反在非常炎热的情况下,及时在30分钟内即已完成这个变粘滑、呈凝胶状的过程。 等到固化工序全部完成后,再进行研磨,这个重庆固化剂环氧地坪施工步骤就要根据地面情况使用研磨机配合50目至300目不等系数的磨片对浸泡过材料的地面进行研磨处理,然后清洗晾干,再喷洒第二遍材料。

    The environment in which the curing agent is applied to the floor is also crucial. If the temperature is about 25 C, it takes about 30 minutes for the curing agent to soak the surface of the concrete. The judgment is based on waiting for the material to become sticky when it is immersed in the surface, and to achieve a slippery feeling similar to gelatin when it is trampled. If it is in the cold winter, although the indoor temperature reaches about 25 degrees Celsius, but this process may take an hour or longer to complete, on the contrary, in very hot conditions, in time for 30 minutes to complete the viscous-slippery, gelatinous process. Wait until the curing process is completed, and then grind, this Chongqing curing agent floor construction step will be based on the ground conditions using grinding machine with 50 mesh to 300 mesh unequal coefficient of the grinding of the ground immersed in the material processing, and then clean and dry, and then spray the second material.

    最后一步就是抛光了,地表面干透后,用垫子对密封固化剂硬化研磨过的地面进行抛光处理,完工后即可交付使用。

    The last step is polishing. After the surface is dry, the surface is polished with a mat on the hardened and abrasive surface of the sealant.