    环氧自流平面涂施工需注意几个细节?

    2018-10-28 12:18:01 无锡盛发地坪科技有限公司 阅读

    环氧自流平面涂施工有几个注意细节?1)、面涂批补:搅拌合环氧面涂树脂和石英砂,胶砂比采用7号石英砂用带齿镘刀批刮,保证厚度0.20㎜,用脱泡滚筒脱泡,固化24小时后,表面检查,除去表面残余气泡等缺陷。2)、计量工将称好的树脂面涂料,放入搅拌容器中,搅拌工预先搅拌。

    What are the details of epoxy self flow flat coating construction? 1) Surface coating patch: mix epoxy surface coating resin and quartz sand, the ratio of glue to sand used 7 quartz sand with a toothed trowel scraping, guaranteed thickness of 0.20, with a defoaming roller defoaming, curing 24 hours, surface inspection, remove surface residual bubbles and other defects. 2), the metrology worker will make the resin surface paint, put it into the mixing container, and the mixer will mix in advance.

    (3)、计量工按配合比依次准确称量好固化剂及其它辅助材料(比如色浆),逐次放入搅拌容器中,同时将用量做好记录。

    (3) Metrologists accurately weigh the curing agent and other auxiliary materials (such as color paste) in turn according to the mixing ratio, and put them into the mixing container one by one, and record the dosage.

    (4)、操作工继续搅拌,至少搅拌5分钟,以保证混合均匀,色泽一致。

    (4), operators continue stirring, stirring for at least 5 minutes to ensure uniform mixing and uniform color. (5)、操作工用带齿镘刀批刮施工,直到均匀。

    (5) the operator will use the toothed trowel to scrape the construction until it is even.

    (6)、批刮完毕后,用脱泡滚筒除气泡,待其固化后,养护48—72小时,即可投入使用。如客户需要,可用打蜡来保护表面。

    (6) After batch scraping, defoaming drum is used to remove bubbles. After curing, it can be put into use for 48-72 hours. If customers need, wax can be used to protect the surface.

    (7)、面层施工完毕,要求平整光滑,色泽均匀,无瑕疵,否则应及时返修,直至合格。

    (7) The surface should be smooth, uniform and flawless after construction, otherwise it should be repaired in time until it is qualified.