    环氧地坪漆报价参考以及施工工艺解析

    2019-08-26 15:48:20 无锡盛发地坪科技有限公司 阅读

    对于环氧地坪涂料,我们都知道,我们经常可以看到它在我们身边,它不仅非常光滑和美丽,而且还具有防滑、耐磨的特点,所以它被广泛应用于车库、医院、篮球场等场所。但是环氧地坪漆报价是多少呢?下面我们详细介绍一下:环氧地坪漆的价格是多少?环氧地坪漆的施工工艺是什么?环氧地坪漆价格及相关数据仅供参考。由于地区不同,价格可能略有不同。

    As we all know, epoxy floor coating is often seen around us. It is not only very smooth and beautiful, but also anti-skid and wear-resistant. So it is widely used in garages, hospitals, basketball courts and other places. But what is the quotation for epoxy floor paint? Next we will introduce in detail: what is the price of epoxy floor paint? What is the construction technology of epoxy floor paint? The price of epoxy floor paint and related data are for reference only. Prices may vary slightly depending on the region. 

    环氧地坪漆施工工艺:

    Construction technology of epoxy floor paint:

    1. 生的治疗:

    1. Treatment of birth:

    1.地面以水泥地面或磨石地面为准。

    1. The ground shall be cement or grindstone.

    2.地面放置28天以上,施工前需水量小于8%,如地面不平或空桶需先拆除。

    2. If the ground is laid for more than 28 days, the water requirement before construction is less than 8%. If the ground is uneven or the empty barrel needs to be removed first.

    3.采用环氧砂浆找平地面。

    3. Leveling the ground with epoxy mortar.

    4.地面上的油应该清洗。

    4. Oil on the ground should be cleaned.

    5.施工前应保持地面干燥、清洁。

    5. The ground should be kept dry and clean before construction.


    2. 基涂层:

    2. Base coatings:

    1.为了保持地面清洁,把主要的固化剂和固化剂混合在一起。

    1. In order to keep the ground clean, the main curing agent and curing agent are mixed together.

    2.根据地面条件调整混合料的粘度,然后在4小时内施工。

    2. Adjust the viscosity of the mixture according to the ground conditions, and then construct in 4 hours.

    3.最下面的一层将在8小时后硬化。

    3. The bottom layer will harden in 8 hours.


    3.在涂料

    3. In paint

    1.为了保持地面清洁,把主要的固化剂和固化剂混合在一起。

    1. In order to keep the ground clean, the main curing agent and curing agent are mixed together.

    2.在混合物中加入一些石英砂。

    2. Adding some quartz sand to the mixture.

    3.用铲子将材料均匀铺好。

    3. Spread the material evenly with a shovel.

    4.混合物应在30分钟内完成。

    4. The mixture should be completed in 30 minutes.

    5. 做好交接工作。

    5. Do a good job of handover.

    6. 涂层硬化时间超过8小时。

    6. The hardening time of the coating exceeds 8 hours.


    4. 层数

    4. Layers

    1.主剂与固化剂混合。

    1. The main agent is mixed with the curing agent.

    2.使用批刀均匀涂布材料。

    2. Use batch knife to coat material evenly.

    3.混合物应在30分钟内完成。

    3. The mixture should be completed in 30 minutes.

    4.批次土的养护时间应大于8小时。

    4. The maintenance time of batch soil should be more than 8 hours.


    5. 表面涂层

    5. Surface coating

    1.施工前保持地面干燥。

    1. Keep the ground dry before construction.

    2.主剂使用前先搅拌均匀。

    2. Stir well before using the main agent.

    3.主剂与固化剂混合。

    3. Mix the main agent with the curing agent.

    4.混合物应在30分钟内完成。

    4. The mixture should be completed in 30 minutes.

    5.做好交接工作。

    5. Do a good job of handover.

    6.完成后,你可以在24小时内吃东西。

    6. After you finish, you can eat in 24 hours.