欢迎光临无锡盛发地坪科技有限公司官网!【环氧地坪_防静电地坪_停车场地坪_耐磨地坪】材料生产,销售和施工的高新技术企业.

    示例图片三
    网站首页 > 新闻资讯 > 地坪知识

    耐磨地坪VS固化地坪的差异在哪里?那个更好?

    2019-08-13 12:55:32 无锡盛发地坪科技有限公司 阅读

    随着环氧地坪漆行业快速发展,有许多甲方客户分不清楚耐磨地坪和固化环氧地坪的差异,耐磨地坪也叫金刚砂环氧地坪,是在混凝土浇筑后再表面撒播一层金刚砂骨料,加强耐磨度。固化地坪也称硬化地坪,是通过混凝土密封固化剂渗透到混凝土内部,通过材料的反响改动混凝土内部结构,然后添加硬度和光泽度。两者施工进程也存在很大的差异。在现在的施工中,许多顾客都选择两种结合起来施工,即耐磨地坪和固化剂一起施工,构成更细密的实体,功用更强壮,使用寿命也更长。 With the rapid development of epoxy floor paint industry, many customers of Party A can not distinguish the difference between wear-resistant floor and solidified floor. The wear-resistant floor is also called diamond floor. It is to spread a layer of diamond aggregate on the surface after concrete pouring to enhance wear resistance. Solidified floor, also known as hardened floor, penetrates into concrete through concrete sealing and curing agent, changes the internal structure of concrete through material response, and then adds hardness and gloss. There are also great differences between the two construction processes. In the current construction, many customers have chosen two kinds of combination construction, namely wear-resistant floor and curing agent construction together, to form a more compact entity, more powerful, and longer service life. 

    耐磨地坪:施工时耐磨骨料彻底被深化混凝土表层,施工是和混凝土同步施工的。施工完工后与混凝土融为一体,究竟的制品就是混凝土的姿势。但在此时混凝土就不会呈现本来简略呈现的问题,比如:用一段时间后呈现风化、粉化、氧化、表面粗糙,简略起尘,不耐酸碱,不耐油污等。

    Wear-resistant floor: Wear-resistant aggregate is thoroughly deepened in the construction of concrete surface, construction is synchronized with concrete construction. After the completion of the construction and concrete into one, the final product is the concrete posture. But at this time, concrete will not present the original simple problems, such as: after a period of time, it will show weathering, powdering, oxidation, rough surface, simple dust, acid and alkali resistance, oil resistance and so on. 

    混凝土密封固化剂地坪:施工时有必要先等混凝土彻底凝集后施工,施工前有必要保证混凝土彻底单调,一般是混凝土施工后保护20天左右后再施工固化剂。固化剂彻底渗透进混凝土与混凝土融为一体,究竟的制品也是混凝土本来的姿势。可是此时的混凝土现已构成密实的整体,抗渗透、抗压、耐磨、耐酸碱盐的腐蚀,不起灰,无需保护和保养。

    Concrete Sealing and Curing Agent Floor: It is necessary to wait for concrete to be completely agglomerated before construction. Before construction, it is necessary to ensure that concrete is completely monotonous. Generally, it is necessary to protect concrete after construction for about 20 days before construction of curing agent. The curing agent penetrates into the concrete thoroughly and integrates with the concrete. The final product is the original posture of the concrete. However, concrete at this time has now formed a compact whole, anti-permeability, compression, wear resistance, acid and alkali salt corrosion resistance, no ash, no need for protection and maintenance. 


    标签:   环氧地坪 地坪 耐磨地坪 固化地坪 环氧地坪施工
    无锡环氧地坪 技术支持:【易商科技】