    为啥环氧地坪漆面施工需封闭施工现场

    2019-06-21 14:25:22 无锡盛发地坪科技有限公司 阅读

    环氧地坪涂层系统主要由底漆层、砂浆层、腻子层、面漆层组成,环氧地坪面漆层是环氧地坪漆施工工艺的最后一道工序,直接决定了整个环氧地坪系统的施工效果。因此,在环氧地坪漆面漆施工时,须对现场进行封闭处理,否则空气中的灰尘或昆虫会破坏已经完工但尚未固化的环氧地坪漆面。不同种类的环氧地坪漆固化时间有所不同。常规环氧地坪漆的固化时间是4~8小时,而在冬季气温较低的情况下,环氧地坪漆的固化时间会有所延长。在环氧地坪漆面漆尚未固化时,要注意现场的封闭保护,防止灰尘及昆虫的破坏。需要注意的是环氧地坪施工现场的封闭不仅仅是关闭现场的门窗,还需要对门窗的缝隙以及各种排风口进行封堵。

    Epoxy floor coating system mainly consists of primer layer, mortar layer, putty layer and topcoat layer. Epoxy floor coating is the last process of epoxy floor paint construction technology, which directly determines the construction effect of the whole epoxy floor system. Therefore, in the construction of epoxy floor paint, the site should be sealed, otherwise dust or insects in the air will damage the finished but not cured epoxy floor paint. The curing time of different kinds of epoxy floor paint is different. The curing time of conventional floor paints is 4 to 8 hours, while the curing time of floor paints will be prolonged when the temperature is low in winter. When the epoxy floor paint has not been cured, attention should be paid to the site closure protection to prevent dust and insect damage. It should be noted that the closure of the epoxy floor construction site is not only to close the doors and windows of the site, but also to plug the gap between the doors and windows and various exhaust outlets.环氧地坪面漆施工方法:

    Construction method of epoxy floor finish:

    1、施工前需保持地面干净,如有杂物粘附需清除;

    1. Keep the ground clean before construction, and remove debris if there is adhesion.

    2、依照正确比例将环氧面漆主剂及固化剂混合,充分搅拌均匀;

    2. Mix the main agent and curing agent of epoxy topcoat according to the correct proportion and mix well.

    3、使用滚筒将材料均匀涂布;

    3. Use drum to coat material evenly.

    4、混合完成材料需30分钟以内施工完成;

    4. It takes less than 30 minutes to complete the construction of the mixed materials.

    5、施工交接处做好交接处理;

    5. Handover treatment should be done at the construction handover site.

    6、施工完成后,24小时后方可上人,72小时后方可重压(以25度为准,低温时开放时间需适度延长。

    6. After the completion of the construction, it is possible to go to work 24 hours later and to press heavily 72 hours later (whichever is 25 degrees, the opening time should be prolonged moderately at low temperature). 