    环氧地坪漆施工前需做好的检查项目包括什么?

    2019-06-19 09:32:51 无锡盛发地坪科技有限公司 阅读

    正规的环氧地坪漆厂家在接到环氧地坪询价电话时,一般都会派遣专业的技术人员前往项目现场查看地面情况,根据客户的需求提供适合的环氧地坪漆施工工艺,再报出准确的地坪漆价格。环氧地坪漆施工之前做好以上几点检查工作是非常必要的,俗话说得好:细节决定成败,要做出优质的环氧地坪工程,做好细节工作是关键。那么环氧地坪漆施工之前需要检查的项目有哪些呢?

    When regular epoxy floor paint manufacturers receive inquiry calls from epoxy floor paint manufacturers, they usually send professional technicians to the project site to check the ground conditions, provide suitable epoxy floor paint construction process according to customer needs, and then report the accurate price of floor paint. Before the construction of epoxy flooring paint, it is very necessary to do the above checks. As the saying goes, details determine success or failure. To make a high quality epoxy flooring project, the key is to do a good job of details. So what items need to be inspected before the epoxy floor paint is constructed?

    1、混凝土地面强度检查

    1. Strength Inspection of Concrete Ground

    环氧地坪漆施工要求混凝土强度在C25以上,可以向客户了解。另外,还要检查地面是否存在起砂、起灰现象,局部是否存在空鼓的现象,地面是否有钢筋类物质(机械打磨时如不注意易损坏机器),然后做好记录。对于起灰、起砂非常严重的地面,光磊环氧地坪漆厂家不建议直接做环氧地坪漆,可以先重新做一遍混凝土,然后在施工环氧地坪漆。

    The construction of epoxy floor paint requires concrete strength above C25, which can be known to customers. In addition, we should check whether there is sand and ash on the ground, whether there is air heave in part, whether there are reinforcing bars on the ground (if we do not pay attention to the machine easily damaged when grinding), and then make a good record. For the ground with very serious ash and sand, Guanglei floor paint manufacturer does not recommend making epoxy floor paint directly. It can first make concrete again and then build floor paint. 基础地面打磨

    Ground grinding of foundation2、地面平整度检查

    2. Ground smoothness inspection

    地面平整度检测需要用到2m靠尺,将靠尺平放于地面上,把尺子平放于地坪基面,测量尺子与地面之间的间隙值,一般要求地面的凹凸度在2mm以下,若都小于这个范围,则地面平整度符合要求;若间隙值大于2mm,则需对基面进行重点打磨、修补找平处理。

    Ground smoothness testing needs 2m ruler, which is laid flat on the ground, and the ruler is laid flat on the ground foundation. To measure the gap between ruler and ground, it is generally required that the concave and convex degree of the ground be less than 2mm. If both are less than this range, the ground smoothness meets the requirements; if the gap value is greater than 2mm, the ground surface should be measured. Focus on polishing, repairing and leveling treatment.3、基础地面含水率检查

    3. Inspection of Ground Water Content of Foundation

    地坪漆施工要求地面含水率不高于6%,否则可能会导致环氧地坪出现起皮、脱层的问题。因此,对于地下室、地下车库等地下水位较高的地方需要做好防水层。一般检测地面换水率可以采用混凝土含水率测量仪,对测量点采用如下原则选择:A、底层(一楼);B、靠近门窗或外墙处;C、局部在混凝土浇铸完工后沾过水的地点;D、落水管、排水沟等附近。如没有测量仪,采用薄膜覆盖法也很有效,要点是薄膜一定不能漏气并要贴地密封严密。对于新的混凝土地面,须向客户了解混凝土已养护多久了,底层有没有施工防水层,在养护期间的天气状况等。一般来说,夏季晴天通风良好时的楼上地面,15天养护期限就可以施工环氧地坪;冬季,雨季养护期应长些,一般需约1个月。

    The construction of floor paint requires that the water content of the ground should not be higher than 6%, otherwise, the problem of peeling and delamination may occur on the epoxy floor. Therefore, waterproofing layer should be done well in places with high groundwater level such as basement and underground garage. Generally, the concrete moisture content measuring instrument can be used to detect the water exchange rate on the ground, and the following principles can be adopted for the measuring points: A, the bottom (first floor); B, near doors and windows or external walls; C, the locality where water has been stained after the completion of concrete casting; D, downspouts, drainage ditches and so on. If there is no measuring instrument, the film covering method is also effective. The main point is that the film must not leak air and be tightly sealed. For new concrete floors, customers should be informed about how long concrete has been maintained, whether there is a construction waterproof layer at the bottom, and weather conditions during maintenance. Generally speaking, when the upper floor is well ventilated on sunny days in summer, the epoxy floor can be constructed within 15 days'maintenance period; in winter, the maintenance period in rainy season should be longer, usually about one month.4、其它方面的检查

    4. Examination of other aspects

    环氧地坪施工需要洁净封闭的涂装环境,任何一个细节的疏忽都可能造成返工或缺陷,造成损失,因而在进场施工前需检查以下方面:A、门窗是否已完好,屋面、水管等是否有漏水隐患;B、照明、电力等设施是否齐备,如需自备,应计划好;C、拟施工期间的天气状况、环境温度。

    Because the epoxy floor construction needs a clean and enclosed painting environment, any negligence of details may cause rework or defects, resulting in losses, so the following aspects should be checked before construction: whether A, doors and windows are in good condition, whether roofs, pipes and other water leakage risks; whether B, lighting, electricity and other facilities are ready, if necessary. Self-prepared, should be well planned; C. Weather conditions and environmental temperature during the proposed construction period.


    标签:   地坪 环氧地坪 环氧地坪施工 环氧地坪漆 无锡环氧地坪