    梅雨季节环氧地坪施工需要注意以下问题

    2019-04-30 09:09:44 无锡盛发地坪科技有限公司 阅读

    进入夏季以来,全国进入了暴雨多发季节,对于环氧地坪漆行业来说,也产生了非常大的影响。业内施工人士都清楚明白环氧地坪漆施工往往是受到天气温度(温度对环氧地坪漆施工的影响)和空气湿度(湿度对环氧地坪漆施工的影响)影响。下雨天气下,空气中水分含量多,相对湿度大,水分容易在环氧地坪漆涂装表面凝结,形成水珠。施工环氧地坪漆时,当空气的相对湿度度超过85%,就必须停止涂装作业,否则地坪漆漆膜会出现发白(地坪漆表面发白的原因及应对方法)、裂纹、剥落等现象。因为油性的地坪漆与水不相溶,所以当地面结露状况严重时,地坪漆涂层甚至会无法附着于地坪基面。

    Since the beginning of summer, the country has entered a rainstorm season, which has a great impact on the epoxy floor paint industry. It is clear to all the workers in the industry that the construction of epoxy floor paint is often influenced by weather temperature (the influence of temperature on the construction of epoxy floor paint) and air humidity (the influence of humidity on the construction of epoxy floor paint). In rainy weather, there is much moisture in the air, and the relative humidity is high. It is easy for water to condense on the surface of floor paint and form water droplets. When applying floor paint, when the relative humidity of air exceeds 85%, painting operation must be stopped. Otherwise, the surface of floor paint will be whitened (the causes of whitening and the countermeasures), cracks, spalling and other phenomena. Because the oily floor paint is not compatible with water, when the dew condition is serious, the floor paint coating can not even adhere to the floor foundation. 

    梅雨季节环氧地坪施工需要注意以下问题:

    The construction of epoxy floor in Meiyu season should pay attention to the following problems:

    1、建议将施工场地的通风系统打开,做好通风工作,这样可以加快室内空气的流动性,也能保障施工人员的身体健康。

    1. It is suggested to open the ventilation system of the construction site and do a good job of ventilation, so as to speed up the fluidity of indoor air and ensure the health of the constructors.

    2、雨天环氧地坪漆施工要做好防护措施,需要准备工业专用的除湿器。 因为雨天,地面无法干燥,可以使用机械烘干。施我们必须保证环氧地坪漆施工工艺的每一道工序都完全干燥才能进行下一步工序。 雨天由于空气湿度较大、地面干燥不充分,而且环氧地坪不像水泥混凝土那样能和水很好 的融合。所以盲目施工便会造成之后的一系列后续问题。

    2. In the construction of epoxy floor paint in rainy days, protective measures should be taken, and special dehumidifiers for industry need to be prepared. Because the ground can not be dried in rainy days, mechanical drying can be used. In order to carry out the next process, we must ensure that every process of the epoxy floor paint construction process is completely dry. In rainy days, the air humidity is high, the ground is not dry enough, and the epoxy floor is not as good as the cement concrete. So blind construction will cause a series of follow-up problems.

    所以在施工地坪漆时,须注意天气预报。如预报未来几天会下雨,则需延迟施工,不能过分追求速度,盲目施工,以免影响地坪漆工程质量。

    Therefore, in the construction of floor paint, attention should be paid to weather forecast. If it is expected to rain in the next few days, construction should be delayed, speed should not be excessively pursued and construction should be carried out blindly, so as to avoid affecting the quality of floor paint project.