    梅雨潮湿季节环氧地坪应如何施工

    2019-02-05 23:04:36 无锡盛发地坪科技有限公司 阅读

    现在又到了一年一度的梅雨季节,梅雨季节里,空气湿度大、气温高,衣物等容易发霉,在如此潮湿的环境中,如何把环氧地坪施工好,是每个环氧地坪施工单位应该考虑的问题。在这种天气中,环氧地坪施工常常会出现一些问题,例如地坪漆会出现发白、气泡问题;或者施工完的地面起皱,因此在梅雨季节进行施工需要注意很多事项,那么在梅雨季节,环氧地坪施工有没有什么好的方法呢?梅雨季节地坪施工出现问题一:在雨季时,因为气压比较低,很多有害物质会残留在室内或装饰装修材料之中,不轻易挥发。阴雨天时不仅空气湿润,而且施工场地空气活动也比较缓慢,因此施工中要将所有的门窗都打开,以保持室内良好的透风。这样不仅有利于施工职员的身体健康,而且有助于地面等的尽早干燥。

    Now it's the annual Meiyu season. During the Meiyu season, the air humidity is high, the temperature is high, and the clothes are easy to mildew. In such a humid environment, how to construct the epoxy floor well is a problem that every floor construction unit should consider. In this kind of weather, there are often some problems in floor construction, such as bleaching and bubbles of floor paint, or wrinkling of the ground after construction, so a lot of matters need to be paid attention to during the Meiyu season. So, in the Meiyu season, is there any good method for epoxy floor construction? In the rainy season, there are problems in floor construction. First, in the rainy season, because the air pressure is relatively low, many harmful substances will remain in the interior or or decoration materials, not easily volatilized. In rainy days, not only the air is wet, but also the air activity in construction site is relatively slow. Therefore, all doors and windows should be opened during construction to maintain good indoor ventilation. This is not only conducive to the health of construction staff, but also conducive to the early drying of the ground and so on. 

    梅雨季节地坪施工出现问题二:在雨季施工,可能会造成油漆发白。墙面轻易形成水汽,刷漆、刮腻子也都不轻易干燥。当腻子没有干透就进行油漆喷涂时,也轻易泛起题目,好比造成日后起泡、开裂等现象。刷漆尽量避开雨天,假如无法避开,那就要多透风,等第一遍刷完干透后,再刷第二遍。此外,可在油漆中加入白化水调和剂等,加速干燥。在墙面刮腻子前,可用干布将湿润水汽擦干。

    In the rainy season, there are two problems in the floor construction. The construction in rainy season may cause the paint to whiten. The wall is easy to form vapor, paint, scrape putty are also not easy to dry. When putty is sprayed without drying thoroughly, it is easy to cause problems, such as foaming and cracking in the future. Paint as far as possible to avoid rainy days, if you can not avoid, then more ventilation, until the first brush dry, then brush the second time. In addition, whitening water mixer can be added to paint to accelerate drying. Before scraping putty on the wall, wet water vapor can be dried with dry cloth.

    梅雨季节地坪施工出现问题三:地板起翘,专家建议出现这种问题的时候,要对铺设地板的水泥地坪要保持干燥,干湿接壤处要采用有效的隔断处理方法。铺地板时应采用防潮膜以便隔离潮气,地板铺设完工后,有前提的宜在隐蔽处留透气孔。要根据地板树种、含水率及空气湿度来决定铺设工艺,不乱性差的树种需开包平衡时间长达72小时。

    During the rainy season, there are three problems in floor construction: floor heave. Experts suggest that when this problem occurs, the cement floor should be kept dry, and the effective partition treatment method should be adopted at the dry-wet junction. When laying the floor, damp-proof film should be used to isolate moisture. After the floor is laid, it is preferable to leave ventilation holes in concealed places if necessary. The paving process should be decided according to the floor tree species, moisture content and air humidity. The unbalanced tree species need to be unbalanced for up to 72 hours.

    梅雨季节地坪施工出现问题四:梅雨季节木制品的含水率往往高于这个百分比,这样在干燥季节轻易泛起木制品开裂、起翘等现象。选购人造板材时,尽量选购近几个月出产出来的,这样的木制品经由了干燥处理,接触湿润空气的时间相对更少,含水率不高。与此相反,选择木龙骨类材料时,则最好选择“陈品”,而且没有在露天存放过的,这样的龙骨含水率会低一些。施工前,最好把木制品包装打开晾一会,让材料和室内的含水率接近。地板起翘,专家建议出现这种问题的时候,要对铺设地板的水泥地坪要保持干燥,干湿接壤处要采用有效的隔断处理方法。铺地板时应采用防潮膜以便隔离潮气,地板铺设完工后,有前提的宜在隐蔽处留透气孔。要根据地板树种、含水率及空气湿度来决定铺设工艺,不乱性差的树种需开包平衡时间长达72小时。

    There are four problems in floor construction in Meiyu season: the moisture content of wood products in Meiyu season is often higher than this percentage, which easily causes cracking and warping of wood products in dry season. When choosing wood-based panels, try to purchase the products produced in recent months. Such wood products have been dried, and the contact time with wet air is relatively less, and the moisture content is not high. On the contrary, when choosing wood keel materials, it is better to choose "old products", and not stored in the open air, such keel moisture content will be lower. Before construction, it is better to open the wood packaging and air it for a while, so that the material and indoor moisture content are close. Floor warping, experts suggest that when this problem arises, to lay the floor of the cement floor to keep dry, dry and wet junctions to use effective partition treatment. When laying the floor, damp-proof film should be used to isolate moisture. After the floor is laid, it is preferable to leave ventilation holes in concealed places if necessary. The paving process should be decided according to the floor tree species, moisture content and air humidity. The unbalanced tree species need to be unbalanced for up to 72 hours.