    环氧地坪施工的主要施工工序繁多,据中国环氧树脂行业协会专家介绍说:首先是基面处理:一是清扫是在施工之前对基层面初步清扫,使工作面完全显露出来;二是基面状况调查通过现场检测工具对工作面进行全面细致的检查,并做好详细记录,地面施工属隐蔽工程故基层面状况务必调查清晰、纪录完整(可分解成多张图纸),基层面的尺寸要单独表明在图纸上(精确到厘米);三是基层上附着物的处理在基层面上往往会留有施工中的水泥尘屑,特别是新施工面有浮浆(水泥游离碱性结晶体),这些附着物在涂层施工之前需用电动工具或錾刀等除去,比较彻底的方法是轻度喷砂,基层面粘附的砂浆屑、泥土、水泥翻沫及油污须彻底清除,特别是油污当选用洗涤剂刷洗后要用清水洗干净、充分干燥;四是打磨、吸尘对于旧的平整度不理想的基面应采用局部打磨与整体打磨相接合的方法进行彻底打磨、吸尘;五是基面缺陷(起壳、裂缝、缺口)的处理,起壳是混凝土和砂浆的结合面剥离、没有附着好的状态(若整个结合面都剥离的话要把砂浆全部清除后重新抹面,

    According to experts from China Epoxy Resin Industry Association, there are many main construction procedures for epoxy floor construction. First, the base surface is treated. First, the base surface is preliminarily cleaned before the construction, so that the working face is fully exposed. Second, the base surface condition investigation carries out a comprehensive and meticulous inspection of the working face through on-site testing tools, and makes detailed records. The ground construction is a concealed worker. Therefore, the condition of the base must be clearly investigated and recorded (which can be decomposed into several drawings). The size of the base should be shown separately on the drawings (accurate to centimeters). Thirdly, the treatment of adhesives on the base often leaves cement dust in construction, especially the floating slurry (cement free alkaline crystals) on the new construction surface. These adhesives need to be electrically operated before coating construction. The more thorough method of removing tools or knives is mild sand blasting. The mortar, clay, cement foam and oil stains adhering to the base surface should be thoroughly removed, especially the oil stains should be washed and fully dried after being washed with detergent. Fourthly, local grinding and overall grinding should be used to thoroughly grind the base surface which is not ideal for the old smoothness. Grinding and dust collection; Fifth, the treatment of surface defects (shelling, cracks, notches). Shelling is the condition that the joint surface of concrete and mortar is peeled off without good adhesion (if the whole joint surface is peeled off, the mortar should be removed completely and then re-coated. 如只是一部分有剥离的话可以用树脂注浆的方法来补修),裂缝往往是由起壳而发生的修补时沿着裂缝部分用电动切割机开1分米左右宽度的U型槽并用树脂砂浆来填补槽,缺口是基层面的一部分发生凹窝的状态(处理方法是把粉尘等脏物吸扫干净,用树脂胶泥抹平:六是护面主要是为了防止施工边缘部分玷污及保持完全直线(或与不涂部分的分界线)应贴护面胶带,这道工序在底涂、中涂及面涂施工之前都要仔细完成。

    If only part of the crack is peeled off, it can be repaired by resin grouting. When the crack is repaired by shell-lifting, the U-shaped groove with a width of about 1 centimetre is opened along the crack with an electric cutting machine and filled with resin mortar. The groove is a concave state occurring in a part of the basic level (the treatment method is to clean up the dust and other dirt, and smooth it with resin mortar:6 The main purpose of the cover is to prevent the staining of the construction edge and to maintain a complete straight line (or the boundary between the non-coated and non-coated parts), the cover tape should be affixed. This process should be carefully completed before the construction of primer, middle coat and surface coat.


    环氧自流平地坪主料和固化剂按比例(参照厂家的产品说明书)配合,用手提电动搅拌机搅拌均匀在吸尘干净的基层面上把混合好的底漆倒在地面上,用橡胶刮板或辊筒把底漆涂抹均匀、充分渗透基层,环氧自流平地坪涂抹量一般为每平方米0.15~0.2公斤(很光滑的基层只要0.1公斤),底漆养护时间一般12小时后确认固化状态进行下一工序施工。中间层是针对基面不平整或有部分缺陷的基层面进行进一步加工的胶泥层或砂浆层。要求根据现场实际情况配制(一般由施工方对现场勘测后确定),对水磨石基层可只做胶泥层不做砂浆层,中间层应养护夏季24小时以上、冬季更长,待完全固化后进行打磨、吸尘。

    The main material and curing agent of epoxy self-leveling floor are proportionally matched (refer to the manufacturer's product instructions). The mixed primer is evenly stirred by hand-held electric mixer on the clean and dust-absorbing base surface. The primer is evenly coated with rubber scraper or roller to fully penetrate the base. The amount of epoxy self-leveling floor is generally 0.15-0.2 kg per square metre (very smooth base layer). As long as 0.1 kg, the maintenance time of primer is generally 12 hours after confirming the solidification state for the next process of construction. The middle layer is a cement layer or mortar layer which is further processed for the base layer with uneven or partial defects. Requirements according to the actual situation of the site preparation (generally determined by the construction party after the site survey), terrazzo base can only be used as cement layer, not mortar layer, the middle layer should be maintained for more than 24 hours in summer, longer in winter, to be completely solidified after polishing, dust absorption.