    如何提升热风炉安全阀的使用效率?

    2018-11-19 08:54:23 无锡盛发地坪科技有限公司 阅读

    如何提升热风炉安全阀成都收账使用效率热风热风炉价格2.1调整热风炉安全阀成都找人公司使用参数一般情况下,大部分热风炉系统都会直接使用购买来成都收账质量合格收账热风炉安全阀。在这样成都找人公司背景下,热风炉系统所使用的热风炉安全阀的使用参数还处于成都找人公司安全阀的出厂额定参数。但是,在实际的运行过程中,为r保证成都收账公司系统的安全运行,大部分的成都收账公司系统都会进行降压运行处理。在这样的背景下,热风炉安全的额定参数不能满足热风炉系统的实际运行情况,长此下去,甚至会影响到热风炉安全阀的使用性能(主要指的是热风炉安全阀的密闭性和开启重复性不断下降)。针对这样的情况,为了有效提升热风炉安全阀的使用效率,需要在使用热风炉安全阀之前,对热风炉安全阀的使用参数进行调整,降低热风炉安全阀的压力参数,使热风炉安全阀可以满足热风炉系统的使用需要,提升热风炉安全阀的使用效率。

    How to improve the efficiency of hot-blast stove safety valve? Price of hot-blast stove 2.1 Adjust the parameters of hot-blast stove safety valve. Generally speaking, most hot-blast stove systems will directly use the purchased qualified hot-blast stove safety valve. Under this background, the operating parameters of the hot blast stove safety valve used in the hot blast stove system are still in the factory rated parameters of the hot blast stove safety valve. However, in the actual operation process, in order to ensure the safe operation of the hot-blast stove system, most of the hot-blast stove systems will be decompressed. In this context, the rated parameters of the hot blast stove safety can not meet the actual operation of the hot blast stove system, and even affect the performance of the hot blast stove safety valve (mainly refers to the continuous decline of the sealing and opening repeatability of the hot blast stove safety valve). In view of this situation, in order to effectively improve the efficiency of the hot blast stove safety valve, it is necessary to adjust the parameters of the hot blast stove safety valve before using the hot blast stove safety valve, reduce the pressure parameters of the hot blast stove safety valve, so that the hot blast stove safety valve can meet the needs of the hot blast stove system and improve the safety of the hot blast stove. The efficiency of all valves.

    2.2控制好热风炉系统的压力变化范围目前,我国的热风炉系统普遍存在着运行压力范围过大的问题,在这样的背景下,就很容易造成热风炉安全阀系统的频繁启跳问题,进而影响到热风炉安全阀系统的使用寿命。与此同时,热风炉安全阀系统的启跳数值和热风炉系统内部的压力值是紧密相关的,如果不能够对热风炉系统的运行进行有效的管理,就很有可能导致热风炉安全阀系统产生频繁启跳的问题。针对这样的情况,在热风炉安全阀系统的使用过程中,要充分保证热风炉系统平稳有序运行,防止热风炉系统内部出现压力大范围波动的情况,进而保证热风炉安全阀处于平稳的使用状态。

    2.2 Controlling the pressure range of hot-blast stove system well at present, there is a widespread problem that the operating pressure range of hot-blast stove system in our country is too large. Under this background, it is easy to cause frequent start-up of hot-blast stove safety valve system, which will affect the service life of hot-blast stove safety valve system. At the same time, the start-up value of the hot-blast stove safety valve system is closely related to the pressure value inside the hot-blast stove system. If the operation of the hot-blast stove system can not be effectively managed, it is likely to lead to frequent start-up problems of the hot-blast stove safety valve system. In view of this situation, during the use of the hot-blast stove safety valve system, it is necessary to ensure the smooth and orderly operation of the hot-blast stove system, to prevent the pressure fluctuation in a large range within the hot-blast stove system, and to ensure the smooth operation of the hot-blast stove safety valve.

    2.3科学合理的完成热风炉安全阀安装过程科学合理地完成热风炉安全阀安装过程,将直接影响到热风炉安全阀的后续使用状态。具体来说,热风炉安全阀中包含相应的气体排放通道,如果没有科学合理地安装热风炉安全阀,就很有可能导致这些介质难以有效地通过热风炉安全阀从热风炉系统排出,给热风炉系统的安全运行留下巨大的安全隐患。针对这样的情况,相关建设单位要严格地按照国家的相关建设法规来安装热风炉安全阀,并保证热风炉安全阀之中的排气通道保持通畅的排气状态,尽可能地避免热风炉安全阀在排气过程中出现气体阻塞的情况,充机械与自动化河南科技核电设备安装中的浆料应用司殿波(电能(烟台)核电技术有限公司,山东烟台265100)出现裂纹现象,使核电设备的整体性能受到影响。表文就核电设备安装过程中装料的验收、配置和施工等进行分析,对影响灌装质量的因素进行探讨,以促使装料在核电设备安装中得到广泛推广和应用。

    2.3 Completing the installation process of hot blast stove safety valve scientifically and reasonably will directly affect the follow-up status of hot blast stove safety valve. Specifically, the hot-blast stove safety valve contains the corresponding gas discharge channels. If the hot-blast stove safety valve is not installed scientifically and reasonably, it is very likely that these media will be difficult to discharge from the hot-blast stove system effectively through the hot-blast stove safety valve, leaving a huge potential safety hazard to the safe operation of the hot-blast stove system. In view of this situation, the relevant construction units should install the hot blast stove safety valve strictly in accordance with the relevant construction regulations of the state, and ensure that the exhaust passage of the hot blast stove safety valve keeps a smooth exhaust state, so as to avoid the gas blockage in the exhaust process of the hot blast stove safety valve as far as possible, and to charge machinery and automation. The slurry application in the installation of chemical Henan science and technology nuclear power equipment, Sitanbo (Electric Energy (Yantai) Nuclear Power Technology Co., Ltd., and Yantai 265100, Shandong Province, appeared cracks, which affected the overall performance of nuclear power equipment. In this paper, the acceptance, configuration and construction of loading materials in the installation of nuclear power equipment are analyzed, and the factors affecting the filling quality are discussed in order to promote the widely application of charging materials in the installation of nuclear power equipment.

    在核电设备的安装中,高强无收缩水泥基灌浆料具有流动性较好、短期强度较高、膨胀轻微、粘性较好、渗透性较强和施工工艺简单等特点,成为重要的安装材料,使核电设备的稳定性得到有效保障。

    In the installation of nuclear power equipment, high-strength non-shrinkage cement-based grouting material has the characteristics of good fluidity, high short-term strength, slight expansion, good viscosity, strong permeability and simple construction technology. It has become an important installation material, which effectively guarantees the stability of nuclear power equipment.

    1灌浆材料的验收和复验为了保证核电设备安装的可靠性,在使用灌浆进行施工前,需要对灌浆料进行验收和复验,以保证灌浆材料符合实际施工要求。一般情况下,灌浆料的验收主要包括产品使用说明书、合格证、出厂检验报告和第三方检验报告四个方面,其中,对于产品的出厂检验报告,必须对灌浆材料的型号、名称、生产日期、流动性、抗强度值、用水量、检验标准和检验员的签字等进行认真审核,以保证灌浆材料的质量可靠。从核电设备安装的情况来看,灌浆材料的复验内容主要包括流动性、抗强度、竖向膨胀量三个方面。在实际施工过程中,灌浆材料的复验必须根据国家相关规定,由国家计量认证的检验单位执行,复验完以后必须和生产厂商进行对比,如果有不符合规定的项目,必须重新更换新的灌浆材料。

    1. In order to ensure the reliability of nuclear power equipment installation, grouting materials need to be checked and checked before grouting construction to ensure that grouting materials meet the actual construction requirements. Generally speaking, the acceptance of grouting material mainly includes four aspects: product instruction, qualification certificate, ex-factory inspection report and third-party inspection report. For the ex-factory inspection report of products, the type, name, production date, fluidity, strength value, water consumption, inspection standards and standards of grouting material must be determined. The inspector's signature is carefully examined to ensure the quality of grouting material is reliable. According to the installation of nuclear power equipment, the re-inspection of grouting materials mainly includes three aspects: fluidity, strength and vertical expansion. In the actual construction process, the re-inspection of grouting materials must be carried out by the national metrological certification inspection unit in accordance with the relevant provisions of the state. After the re-inspection, the grouting materials must be compared with the manufacturer. If there are non-conforming items, new grouting materials must be replaced. 



    标签:   热风炉 环氧地坪漆 地坪 环氧地坪 环氧地坪施工